Time Management | Features

Timesheets

The perfect balance between the scheduled time produced from the Resource Scheduler and the reported time captured in Timesheets.

Hub-Planner_Timesheets_Hero

How time gets tracked

  • Simple and intuitive time entry

  • Scheduled time from resource scheduler suggested directly into the users timesheet for quick and smart time entry.

  • Categorize time entires by task or area worked

  • Actual vs Scheduled Spend, Time and Utilization

  • Fully integrated time entry Approval work flow

Complete more timesheets on time and with great insight.

Key Features of Timesheets

consultant2

Easy to use

Powerful yet simple to use, timesheets your team will actually adopt.
knowledge_management_purple

Smart suggestions

Smart suggestions help pre-fill your timesheet based on your schedule
invoicing_purple

Billable work

Easily mark work as billable or non billable work to make spend reports.
budget_purple

Real-time Reporting

Instant insights into projects, resources, utilization, spend and budgets.

 

task_management_purple

Categorize Work

Break down the work you do by type, department or category.
quality_assurance_purple

Approval Workflow

An option to have all timesheets managed by an approval workflow.

Want to learn more about resource management at Milient?

Julie Gobeil Averna

“Hub Planner is a great visual tool to easily plan your capacity and make quick decisions. The UI is extremely well-designed and easy to use. The search bar to filter your resource pool by skills is my all-time favorite.”

Julie Gobeil
Global Planning Manager at Averna

Know your burn on projects

With the valuable second metric of actual time in the system you can now use this for doing more complex calculations in reports for burn by comparing scheduled versus actual time.

Hub-Planner_Timesheets_Calculate-Burn-4-1
Hub-Planner_Dependencies_Across-multiple-2

Categorize your work

Adding a category to each time entry lets you breakdown your work into smaller chunks. If you are working on a project and instead of putting all the time against 1 project or client, you can specify:

  • Photoshop 2 hours
  • Copywriting 2 hours
  • Research 4 hours

This gives more detail while still tracking the same project.

Trusted by teams, rated by users

G2 High Performer - Easy to use, great support, loved by growing teams
2025 Hub Planner Spring Badges

Hub Planner Timesheets FQA

We currently use a Timesheet Software, can we move to Hub Planner?

Absolutley.

No worries, we have many different options that you can avail of to migrate your existing time entry data over to Hub Planner.

You can take advantage of our built in upload tools for Time Entires using a simple csv upload tool.

You can use our full RestAPI to programmatically create the connection and pull in data from your existing timesheets software.

You can use a third party service such as Zapier to do this.

You can talk to our wonderful support team and they can help you or suggest way to do this after evaluating your data.

Either way you choose there is a solution for you, so no worries.

We don't want to move over yet to Hub Planner timesheets, but we want to add the actuals to it, can we still use it?

Yes, of course. If you are not ready to use the Hub Planner timesheet component or you are happy enough with what you have then you can still get your actuals into Hub Planner by using one of the import functions to upload via csv or use the Rest API to add your data.

Our support team are there to help you should you have any questions.

What is the approval workflow for timesheets?

The approval workflow in timesheets is a two-step approval process that allows a logged-in user to lock and unlock timesheet entries for all projects and resources they have permissions for, ensuring a more secure and verified approval system.  It also provides an additional layer of verification, ensuring that timesheets are accurate and approved by the appropriate person. This helps in maintaining the integrity of the time tracking and reporting system.

 

Does the scheduled time affect the timesheets?

No. Both of these metrics are kept separate in the system. It is generally bad practice that the schedule time can change the reported time or vice versa. By keeping scheduled time and reported time separate you can report on both of these metrics and compare both against each other.

What Hub Planner does do is it passes in the scheduled time as a suggestion to the time sheets which makes it easier for team members to know what they were scheduled on.

How can we get the actual time worked reflected in Hub Planner?

The Hub Planner resource scheduler allows you to forecast, schedule and plan your team across projects. This produces what we call the “scheduled” time within the system. To get the actuals you will need to activate the extension called “Timesheets” which allows your team to record all of the actuals.

The actuals and scheduled times in Hub Planner are kept separate. This is advantageous when it comes to reports and being able to understand how you are planning as a team versus how you are actually performing.

How does reporting work with Timesheets?

Reporting provides instant insights into various aspects such as projects, resources, utilization, spend, and budgets actuals. This helps to compare the schedule time and spend with the reported time and spend in timesheets.

 

Book a demo

Get hands-on

Try out key features with our team guiding you step-by-step